 |
 |
Handrail Installation |
 |
 |
Existing Handrail and knee wall |
 |
 |
 |
|
Handrail and knee wall cap removed. |
 |
 |
 |
|
The new red oak cap is being marked prior to installation. |
 |
 |
 |
|
The new cap has been installed along with the new rail and new post. A hole is being drilled for the installation of a heavy duty lag screw. |
 |
 |
 |
|
The new post is plum. |
 |
 |
 |
|
Oak balusters are being installed. |
 |
 |
 |
|
Proper spacing of balusters. |
 |
 |
 |
|
Completed handrail, balusters and cap. |
 |
 |
 |
|
The blue tape is holding the oak plugs while the glue dries. |
 |
 |
 |
|
Stained and ready for the finish. |
 |
 |